Structural engineering and concrete design office

Opening a stone wall: special precautions
In the old houses of the Côte d'Azur, many load-bearing walls are built of stone. An opening in a stone wall is possible, but it is not handled like one in a concrete-block wall. The sensitive point is the bearings: the places where the new beam will rest. Here are the special precautions to take, and why the structural engineer often specifies reinforced-concrete columns.
Why a stone wall needs more precautions
A concrete-block wall is regular: the blocks have the same size and the same strength. A stone wall is heterogeneous. The stones vary in shape and size, the mortar that binds them is often an old lime mortar, sometimes crumbly, and the thickness of the wall can change from one place to another.
As long as the wall is whole, the loads are spread over its full length. As soon as it is opened, all the weight that went through the demolished part is concentrated on two points, one on each side of the opening. If the beam rests directly on stones, they can rotate, slide or crush: this is the cause of many cracks after the work.
The general rules still apply (prior study, propping, beam design): we explain them in our article How to open a load-bearing wall safely. Stone mainly adds the question of the bearings.
The reinforced-concrete column: a new bearing in the stone
The most common solution is to create, on each side of the future opening, a reinforced-concrete column cast in the wall:
- the wall is demolished locally over the height of the column, by cutting a pocket (a cavity) into the stone;
- a steel reinforcement cage, sized by calculation, is placed;
- the concrete is cast in formwork and keyed into the existing masonry (this is called toothing);
- the concrete is left to harden before going any further.
The column becomes a uniform bearing of known cross-section on which the beam can rest. It takes the loads down to the bottom of the wall and spreads the force into the surrounding masonry.
One essential precaution: the columns are built one at a time. Until the first one has hardened, the location of the second is not touched. This way the wall is never weakened in two places at the same time.
Concrete column or steel column?
Both exist. A reinforced-concrete column cast in place follows the irregular shape of the stone, which often makes it the best choice in an old wall. A steel column (a UPN or HEA section, for example) is slimmer and quicker to install; it works well against an opening reveal that is already straight, set on a concrete pad that spreads its load.
Both can be combined on the same site. In a recent study near Cannes, our engineers specified two reinforced-concrete columns in the stone wall and a steel column against an existing opening: see this project near Cannes.
The steps of an opening in a stone wall
- Propping. Before any demolition, adjustable props are placed on both sides of the wall to support the floor above. If a roof truss bears on the wall, props are also placed in the loft.
- Building the columns, one at a time, letting the concrete harden in between.
- Cutting the slot and installing the beam under the floor or under the existing concrete ring beam.
- Packing and load transfer: wedges are driven in little by little so that the beam takes the weight, then concrete or non-shrink mortar packing ensures full contact.
- Demolition of the wall between the columns.
- Gradual removal of the props, while monitoring cracks and deflection (the slight bending of the beam).
What the engineer checks before calculating
- what the wall carries: the upper floor, partitions, roof, sometimes a roof truss;
- the condition of the stone and mortar, and the actual thickness of the wall;
- existing elements to keep, such as a concrete ring beam or tie beam, which help spread the loads;
- what lies under the future columns: ground floor slab, wall of the level below, foundation.
This information feeds the calculation and the construction drawing, which gives the contractor the sections, the reinforcement, the order of the work and the propping.